Friday, January 9, 2009

dishcloth knitted pattern

Materials required: 1 ball dishcloth cotton & appropriate needles
Abbreviations:
K -- Knit K2tog -- Knit two stitches together K-FB -- Knit into the front of the next stitch and, before removing it from the needle, knit into the back of the same stitch SKP -- Slip one stitch knit-wise, knit 1 stitch, pass slipped stitch over Turn -- Put the stuff in your right hand into your left hand and the stuff that used to be in your left hand into your right hand Pick up -- Insert right hand needle from front to back into side of previous layer between two garter bumps, wrap the yarn around the needle and pull a stitch through
Directions:Very loosely, cast on 24 stitches.Bottom Triangle:
K 1, turn,
K 1, turn.
K 2, turn,
K 2, turn.
K 3, turn,
K 3, turn.
K 4, turn,
K 4, turn.
K 5, turn,
K 5, turn.
K 6, turn,
K 6, turn.
K 7, turn,
K 7, turn.
K 8, do not turn.
Repeat the directions for the Bottom Triangle twice more – three triangles in total.
They look a little twisted right now. Don’t worry; they’ll sort themselves out as you go along.
Turn and make an Increasing Side Triangle.
Increasing Side Triangle:
K 1, turn,
K-FB, turn.
K 1, SKP, turn,
K-FB, K 1, turn.
K 2, SKP, turn,
K 1, K-FB, K 1, turn.
K 3, SKP, turn,
K 2, K-FB, K 1, turn.
K 4, SKP, turn,
K 3, K-FB, K 1, turn.
K 5, SKP, turn,
K 4, K-FB, K 1, turn.
K 6, SKP, turn,
K 5, K-FB, K 1, turn.
K 7, SKP, do not turn.
Now make a Square.
Square:
Pick up 8 stitches along the side of the previous row, turn.
* K 8, turn, K 7, SKP, turn. *Repeat between the *s another seven times, but do not turn at the end of the eighth repeat.
Make another Square, and then a Decreasing Side Triangle.
Decreasing Side Triangle:
Pick up 8 stitches along the side of the previous row, turn,
K 8, turn.
K 6, K2tog, turn,
K 7, turn.
K 5, K2tog, turn,
K 6, turn.
K 4, K2tog, turn,
K 5, turn.
K 3, K2tog, turn,
K 4, turn.
K 2, K2tog, turn,
K 3, turn.
K 1, K2tog, turn,
K 2, turn.
K2tog, turn.
You are left with one stitch on the left hand needle. Transfer it to the right-hand needle. Pick up a further 7 stitches down the side of the previous row so you have 8 stitches in total, turn, and continue with the directions for Square.
Make two more Squares.
Continue adding layers in a similar manner. The next layer will be Increasing Triangle, two Squares, then Decreasing Triangle.
The next layer will be three Squares.
The next series will be Increasing Triangle, two Squares, then Decreasing Triangle.
Now it is time to make triangles along the top. Transfer the remaining stitch to your right hand needle and proceed with Top Triangle.
Top Triangle:
Pick up 7 stitches along the side of the previous row, turn.
K 6, K2tog, turn,
K 6, SKP, turn
K 5, K2tog, turn,
K 5, SKP, turn
K 4, K2tog, turn,
K 4, SKP, turn
K 3, K2tog, turn,
K 3, SKP, turn
K 2, K2tog, turn,
K 2, SKP, turn
K 1, K2tog, turn,
K 1, SKP, turn
K2tog, turn,
SKP.K 1 and pass the second stitch on the right-hand needle over the first.
You are left with one stitch on the right-hand needle.
Make 2 more Top Triangles, fasten off last stitch and weave in ends.

No comments:

Post a Comment